02 Dec Laboratory and analysis in steam and combined cycle power plants Posted at 01:05h in Catalog Energy by WLE team 0 Comments 0 Likes REF 13404The objectives of this training are:Reminder of the Basic design of a combined cycle power plants: o Gas Turbine (GT)Heat Recovery Steam Generator (HRSG)Steam Turbine (ST)Condenser &Cooling towerPumpNotion of thermal efficiencyKnow the necessary checks and tests to monitor the water qualityBuild and organize the testing laboratoryConduct measurements and testsOrganize inputs and outgoingOrganize control laboratoryConduct measurements and testsThe program of this training is the following:Tests and checks required to monitor the quality of water and sewage waterSpecific equipment for water analysisOrganization of measure campaignManagement of the equipmentSelf-monitoring and validation of resultsOrganization of a series of measurementsMaintenance of field equipmentManagement of the consumablesManagement of inputs and outputsService organization within the constraintsFor more information, please contact info@wlenergy.fr Tags: Foramtion Condenser, formation combined cycle, formation combined cycle power plant, formation Cooling tower, formation Gas Turbine, formation Heat Recovery Steam Generator, formation pump power, formation Steam Turbine, training combined cycle power plants, training gas turbine, training GT, training Heat Recovery Steam Generator, training pump power, training Steam Turbine
Sorry, the comment form is closed at this time.