Laboratory and analysis in steam and combined cycle power plants

Laboratory and analysis in steam and combined cycle power plants


REF 13404


The objectives of this training are :

  • Reminder of the Basic design of a combined cycle power plants: o Gas Turbine (GT)
  • Heat Recovery Steam Generator (HRSG)
  • Steam Turbine (ST)
  • Condenser & Cooling tower
  • Pump
  • Notion of thermal efficiency
  • Know the necessary checks and tests to monitor the water quality
  • Build and organize the testing laboratory
  • Conduct measurements and tests
  • Organize inputs and outgoing
  • Organize control laboratory
  • Conduct measurements and tests


The program of this training is the following :

  • Tests and checks required to monitor the quality of water and sewage water
  • Specific equipment for water analysis
  • Organization of measure campaign
  • Management of the equipment
  • Self-monitoring and validation of results
  • Organization of a series of measurements
  • Maintenance of field equipment
  • Management of the consumables
  • Management of inputs and outputs
  • Service organization within the constraints


For more information, please contact 
info@wlenergy.fr

No Comments

Sorry, the comment form is closed at this time.